AUSTRO Baumaschinen

TEREX TA300 articulated dumper in EUROVIA Kamenolomy

At the time when EUROVIA Kamenolomy a.s. was deciding about purchasing an articulated dumper, the winner was TEREX TA300 and our company promptly delivered it. The machine operates reliably and trouble-free in a two-shift operation almost continuously.

The Chornice quarry mines Moravian greywacke; the annual production is around 300,000 tonnes, production takes place in 2 shifts. The TEREX TA300 articulated dumper is deployed in mining, where the excavated material is transported from the lower level to the hopper of the primer to the technological line on the upper level.

loading